Start me new job in september and have only 6 days left at work (two of them being the weekend and not in work).
Handed in me notice (12 month) and still had nearly two weeks holidays left, been waiting ages for a new contract (side stepped into a new position last september), still hadn't got one in July so to add a bit of pressure applied for this job (Then ghot the bugger!)
Everyone at work is a bit pissed off as the new job comes with 40 days Holiday (8 weeks as I only work Monday to Friday!), as well as all the Bank Holidays (Nice!)
Then it's off to Turkey for a well deserved break for me and me Julie on the 25th August.
Gonna do some serious drinking as the hol is All Inclusive!
When I get back I'll have about 3 days to get over all the Drinking/Hangover before I starts me new job as Senior Network Engineer at a local college!
Money's quite good to boot!
Handed in me notice (12 month) and still had nearly two weeks holidays left, been waiting ages for a new contract (side stepped into a new position last september), still hadn't got one in July so to add a bit of pressure applied for this job (Then ghot the bugger!)
Everyone at work is a bit pissed off as the new job comes with 40 days Holiday (8 weeks as I only work Monday to Friday!), as well as all the Bank Holidays (Nice!)
Then it's off to Turkey for a well deserved break for me and me Julie on the 25th August.
Gonna do some serious drinking as the hol is All Inclusive!
When I get back I'll have about 3 days to get over all the Drinking/Hangover before I starts me new job as Senior Network Engineer at a local college!
Money's quite good to boot!